321

BIOROCK-S Installation in Berkshire

BIOROCK-S Installation in Berkshire

Location

Maidenhead, Berkshire

Project

2 Bedroom Annex with Studio.

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit

Background

The client had the option to connect to the mains but the costs, permitting time and access permits proved prohibitive. As the plant was to be located quite close to the building the client also wanted a plant without noise and with minimum maintenance. It was also planned to discharge to a nearby stream and required a high quality final effluent.

Installation

Installation was carried out by the clients contractor under the supervision of a BIOROCK engineer and was completed in less than 2 days.

¿Quieres ponerte en contacto con nosotros?

Hola, soy José Manuel Rodríguez , International Sales Director de BIOROCK. Póngase en contacto con nosotros ahora para una evaluación de proyecto GRATUITA.

¿Dónde se encuentra?

Acerca de usted

Para contactar contigo

El prefijo telefónico se establece automáticamente después de seleccionar el país.

¿En qué le podemos ayudar?

Si elige "otro" por favor indíquelo en el campo de "observaciones".

¿Cómo le podemos ayudar?